Join our network. Make change happen.

GBPN connects like-minded people around the world to research, educate and implement change. Join us today.

CLOSE

Reports

3 result(s) found

Exploring environmental and economic costs and benefits of a circular economy approach to the construction and demolition sector. A literature review

Text
English
Authors:
Patrizia Ghisellini, Maddalena Ripa, Sergio Ulgiati

Circular economy (CE) as a new model of economic development promotes the maximum reuse/recycling of materials, goods and components in order to decrease waste generation to the largest possible extent. It aims to innovate the entire chain of production, consumption, distribution and recovery of materials and energy according to a cradle to cradle vision.

THE MOVE TOWARD NET ZERO ENERGY BUILDINGS: Experiences and Lessons from Early Adopters

Text
English
Authors:
Anda Ghiran,
Armin Mayer

Around the world, engineers, architects and policymakers have been exploring ways to deliver highly efficient buildings whose reduced energy demand is satisfied by clean, renewable energy. Building off of the broader concept of a green or sustainable building, the concept of the “net zero building” focuses on the energy dynamics and performance of the building. And as policymakers and leaders align toward the net zero concept, the focus on achieving deep energy efficiency has centered on integrated technologies as well as ways to connect buildings to the natural environment.

Implementing the cost-optimal methodology in EU countries

Text
English
Authors:
Bogdan Atanasiu,
Ilektra Kouloumpi,
Kirsten Engelund Thomsen,
Søren Aggerholm,
Andreas Enseling,
Tobias Loga,
Klemens Leutgöb,
Johannes Rammerstorfer,
Konrad Witczak

This study presents three cost-optimal calculations. The overall aim is to provide a deeper analysis and to provide additional guidance on how to properly implement the cost-optimality methodology in Member States. Without proper guidance and lessons from exemplary case studies using realistic input data (reflecting the likely future development), there is a risk that the cost-optimal methodology may be implemented at suboptimal levels.

Search

CLOSE