Join our network. Make change happen.

GBPN connects like-minded people around the world to research, educate and implement change. Join us today.

CLOSE

Reports

3 result(s) found

The role of economic and policy variables in energy-efficient retrofitting assessment. A stochastic Life Cycle Costing methodology

Text
English
Authors:
Edoardo Baldoni,
Silvia Coderoni,
Marco D'Orazio,
Elisa Di Giuseppe,
Roberto Esposti

Energy saving is a major policy objective worldwide and in the EU in particular. Evaluating the convenience of energy-efficient investments, however, is complex. This paper aims to apply stochastic Life Cycle Costing to assess the economic value of energy-efficient building retrofitting investments. The proposed approach investigates how macroeconomic variables affect such an evaluation by explicitly taking into account their interdependent stochastic nature.

Indoor mould exposure: Characteristics, influences and corresponding associations with built environment—A review

Text
English
Authors:
Chenqiu Du, Baizhan Li, Wei Yu

While household mould growth has been increasingly highlighted in response to its adverse health outcomes and building management burden, studies are reviewed respectively from perspective of epidemiological survey, or building technology. This paper thus presents a literature review to address the building environment and mould exposure in homes, including the mould growth and exposure characteristics, interaction with building features, design requirements from current standards.

Implementing the cost-optimal methodology in EU countries

Text
English
Authors:
Bogdan Atanasiu,
Ilektra Kouloumpi,
Kirsten Engelund Thomsen,
Søren Aggerholm,
Andreas Enseling,
Tobias Loga,
Klemens Leutgöb,
Johannes Rammerstorfer,
Konrad Witczak

This study presents three cost-optimal calculations. The overall aim is to provide a deeper analysis and to provide additional guidance on how to properly implement the cost-optimality methodology in Member States. Without proper guidance and lessons from exemplary case studies using realistic input data (reflecting the likely future development), there is a risk that the cost-optimal methodology may be implemented at suboptimal levels.

Search

CLOSE